retaining wall Archives - Zhonglu Engineering Materials Co.Ltd https://www.geogridfactory.com/tag/retaining-wall/ Wed, 25 Oct 2023 08:50:10 +0000 en-US hourly 1 https://wordpress.org/?v=6.0.3 Geogrid retaining wall https://www.geogridfactory.com/geogrid-retaining-wall/ https://www.geogridfactory.com/geogrid-retaining-wall/#respond Tue, 13 Jun 2023 06:58:07 +0000 https://www.geogridfactory.com/?p=3667 Geogrid is a geosynthetic material, made of polymers, which is used to reinforce soil behind retaining walls. Installed in horizontal layers between wall courses and extending into the soil behind a wall, geogrid stabilizes the soil and so increases a wall system’s mass and stability. Geogrid products include the very latest technology in biaxial and …

Geogrid retaining wall Read More »

The post Geogrid retaining wall appeared first on Zhonglu Engineering Materials Co.Ltd.

]]>
Geogrid is a geosynthetic material, made of polymers, which is used to reinforce soil behind retaining walls. Installed in horizontal layers between wall courses and extending into the soil behind a wall, geogrid stabilizes the soil and so increases a wall system’s mass and stability.

Geogrid products include the very latest technology in biaxial and uniaxial geogrids. Designed and manufactured in-house at ISO 9001 certified manufacturing facilities our line of soil reinforcement & stabilization geogrids and asphalt reinforcement geogrids consistently meets demanding QA/QC requirements and are continuously tested to rigorous ASTM standards both in-house and by leading independent geosynthetics laboratories in North America.

Application scope
  • Applicable to all kinds of road, railway, airport roadbed enhanced pavement enhancement.
  • for large parking lot and terminal yard and other permanent bearing foundation enhancement.
  • for rail, road slope protection.
  • the application of the culvert enhanced.
  • for one-way stretch geogrid reinforced after the secondary slope of the soil to further enhance the soil slope to prevent soil erosion.
  • mine, tunnel reinforcement.

The post Geogrid retaining wall appeared first on Zhonglu Engineering Materials Co.Ltd.

]]>
https://www.geogridfactory.com/geogrid-retaining-wall/feed/ 0
7steps to building a retaining wall with geogrid https://www.geogridfactory.com/7steps-to-building-a-retaining-wall-with-geogrid/ https://www.geogridfactory.com/7steps-to-building-a-retaining-wall-with-geogrid/#respond Thu, 16 Mar 2023 01:49:18 +0000 https://www.geogridfactory.com/?p=3504 Building a retaining wall with geogrid involves several steps. Here is a general overview of the process: Plan the wall: Determine the location and size of the wall, and calculate the amount of materials you will need. Consider the soil conditions, drainage, and any other factors that may affect the stability of the wall. Excavate …

7steps to building a retaining wall with geogrid Read More »

The post 7steps to building a retaining wall with geogrid appeared first on Zhonglu Engineering Materials Co.Ltd.

]]>
Building a retaining wall with geogrid involves several steps. Here is a general overview of the process:

Building a retaining wall with geogrid involves several steps. Here is a general overview of the process:  Plan the wall: Determine the location and size of the wall, and calculate the amount of materials you will need. Consider the soil conditions, drainage, and any other factors that may affect the stability of the wall.  Excavate the site: Dig a trench along the length of the wall, making it deep enough to accommodate the first course of blocks and the geogrid. Level the bottom of the trench and compact the soil to create a stable base.  Install the base course: Lay the first course of blocks in the trench, making sure they are level and flush with the ground. Backfill behind the blocks with gravel or crushed stone, and compact it to create a stable base for the rest of the wall.  Install the geogrid: Unroll the geogrid and place it on top of the first course of blocks, extending it back into the soil behind the wall. Make sure the geogrid is centered over the joints between the blocks, and that there is enough excess material to fold over the next course of blocks.  Build the wall: Lay the second course of blocks on top of the first, making sure they are level and flush with the first course. Fold the excess geogrid over the top of the second course of blocks, and continue this pattern for each subsequent course of blocks.  Backfill the wall: Backfill behind the wall with gravel or crushed stone, compacting it in layers as you go. Make sure the backfill is level with the top of the blocks.  Finish the wall: Install any necessary drainage systems, such as a perforated pipe or drainage fabric, to prevent water from building up behind the wall. Install a capstone or other finish material on top of the wall to protect it from weathering and erosion.  Overall, building a retaining wall with geogrid requires careful planning and attention to detail. It's important to follow the manufacturer's instructions for the specific type of geogrid and blocks you are using, and to consult with a professional engineer if you have any doubts about the stability or safety of the wall.
7steps to building a retaining wall with geogrid
[contact-form-7]
  1. Plan the wall: Determine the location and size of the wall, and calculate the amount of materials you will need. Consider the soil conditions, drainage, and any other factors that may affect the stability of the wall.
  2. Excavate the site: Dig a trench along the length of the wall, making it deep enough to accommodate the first course of blocks and the geogrid. Level the bottom of the trench and compact the soil to create a stable base.
  3. Install the base course: Lay the first course of blocks in the trench, making sure they are level and flush with the ground. Backfill behind the blocks with gravel or crushed stone, and compact it to create a stable base for the rest of the wall.
  4. Install the geogrid: Unroll the geogrid and place it on top of the first course of blocks, extending it back into the soil behind the wall. Make sure the geogrid is centered over the joints between the blocks, and that there is enough excess material to fold over the next course of blocks.
  5. Build the wall: Lay the second course of blocks on top of the first, making sure they are level and flush with the first course. Fold the excess geogrid over the top of the second course of blocks, and continue this pattern for each subsequent course of blocks.
  6. Backfill the wall: Backfill behind the wall with gravel or crushed stone, compacting it in layers as you go. Make sure the backfill is level with the top of the blocks.
  7. Finish the wall: Install any necessary drainage systems, such as a perforated pipe or drainage fabric, to prevent water from building up behind the wall. Install a capstone or other finish material on top of the wall to protect it from weathering and erosion.

Overall, building a retaining wall with geogrid requires careful planning and attention to detail. It’s important to follow the manufacturer’s instructions for the specific type of geogrid and blocks you are using, and to consult with a professional engineer if you have any doubts about the stability or safety of the wall.

The post 7steps to building a retaining wall with geogrid appeared first on Zhonglu Engineering Materials Co.Ltd.

]]>